TMRC

The Dispatcher's Log

206 entries, going back to 1997

2025

  • Campus Preview Weekend 2025 Open House

    We will be hosting open hours in the clubroom (N52-118) for the campus preview weekend from 6:30-8:30pm on Saturday, April 19th. We welcome admitted students to …

  • Spring 2025 Regular Meeting Schedule

    Our regularly scheduled meetings for the Spring 2025 Semester will be on Wednesdays at 6:30pm in the club room (N52-118). Feel free to drop in if you’re …

  • First Meeting Spring 2025

    Our first meeting of the Spring 2025 Semester will be this Wednesday, February 5th at 6:30pm in the club room (N52-118). This is a great opportunity to get to …

2024

  • First Meeting Fall 2024

    Our first meeting of the Fall 2024 Semester will be this Friday, September 13th at 8pm in the club room (N52-118). This is a great opportunity to get to know …

  • System 4 Circuit Boards Arrive

    The new circuit boards and the corresponding parts for System 4 have arrived! Help is needed assembling them so feel free to stop by the club room and help out …

2018

  • Monthly Update March 2018

    March 25 John P persuaded John T and Chris to try some hand-laid track on the upper level.

2017

  • Monthly Update November 2017

    November 4 More Progress on the upper level. A lovely new turnout!

  • Monthly Update October 2017

    October 28 This shows the state of Progress on the upper level. The metal blocks clamped to the plywood serve to damp the effect of nailing down roadbed.

  • Monthly Update May 2017

    May 27 The fans that cool the electronics for the Tetris game had been making an ominous rumbling sound for a long time. Examination showed that they were …

2016

  • Monthly Update November 2016

    November 9 We received a message from the daughter of former member Eric Bott, who made the Coca-Bubblie sign back in his student days around 1970. It’s …

  • Monthly Update September 2016

    September 03 Prajwal has deserted the chalets and glaciers of Switzerland for a few weeks, and of course the first thing he did at TMRC was get his European …

  • Monthly Update August 2016

    August 31 This is the dollar bill acceptor from the Coke(R) machine, with a note saying “Coins only”. Time for a fix! Here’s its replacement, …

  • Monthly Update February 2016

    February 13 Some belated credit for David Lambeth of the West Coast Shops. He made these gorgeous silos for the chemical plant. He also made a section of …

2015

  • Monthly Update November 2015

    November 21Yes, we do remember how to do a Progress Report! The Saturday before Thanksgiving is usually Open House day--and it was reasonably succesful. John T …

  • Monthly Update August 2015

    August 28 Alex assembled a storage tank for the chemical plant. A calamity occurred when John P attempted to add new tracks to the layout file. The computer …

  • Monthly Update June 2015

    June 3 A new block card and O the horror, it has a cold solder joint. Survey work on the upper level. Build track first, then measure it to make an accurate …

2014

  • Monthly Update December 2014

    December 6 Howard’s skills with repair of intricate mechanisms were called upon to fix this grabber which someone left in the clubroom, but he said it …

  • Monthly Update November 2014

    November 12 After years of annoyance, John P decided to remove the “Magnetic Storm” uncoupler from Gifford City. Here’s the worksite ater the …

  • Monthly Update October 2014

    October 31We didn’t get around to any Progress Report in October, so we’ll tell a big lie about the date on this one: maybe it should really be Nov …

  • Monthly Update September 2014

    September 03 A praying mantis was observed in the hallway.

  • Monthly Update August 2014

    August 07 We have been generously given some second-hand models, which Alex has volunteered to evaluate and sell on eBay. Here he is attempting to get a loco …

  • Monthly Update July 2014

    July 02 The next block card (and the final one, using the present circuit boards) is under construction.

  • Monthly Update June 2014

    June 04 Luis has finished his tower, allowing for a few fixups. And is that paint job adequate?

  • Monthly Update May 2014

    May 28 There’s now a 3-way turnout in the paper mill area on the upper level.

  • Monthly Update April 2014

    April 16 Dillon thought that the workbench needed a new coat of paint, and he enlisted new member Natasha to help apply it.

  • Monthly Update March 2014

    March 01 John P got the new shelves started--after several trips to the big-box hardware stores in search of suitable anchors and fasteners. Already the clutter …

  • Monthly Update February 2014

    February 01 The Operating Session that we planned didn’t turn out as expected. A fair number of people took it as an invitation to come as spectators.

  • Monthly Update January 2014

    January 11 An attempt at creating a transition rail from code 70 down to code 55, by crushing the rail. This doesn’t look pretty, but there is hope for …

2013

  • Monthly Update December 2013

    December 14 New ties for new track! A review of the likely operation of the paper mill showed how much we need a lead/engine escape track. That’s …

  • Monthly Update November 2013

    November 3We had a journalism student from BU come over and take some pictures a while back - here are the results! All photo credits to Poncie Rutsch …

  • Monthly Update October 2013

    October 2 Dillon has been laying ties in the paper mill area on the upper level.

  • Monthly Update September 2013

    September 4 For the first time in living memory--we’re getting the floor cleaned and waxed. But there’s work to be done…

  • Monthly Update August 2013

    August 17 Somebody asked how we do occupancy detection. It’s easy--a 38K resistor on one wheelset of each car, attached with conductive epoxy. If you look …

  • Monthly Update July 2013

    July 24 Veteran member Richard Greenblatt and new member Prajwal Mohanmurthy are working together on trying to understand the System software.

  • Monthly Update June 2013

    June 05 For no particular reason, signals at Berkmannville.

  • Monthly Update May 2013

    May 01 A photographer stopped by to take some amazing pictures of the layout. All Credit goes to Bruce Horwitz Photography. Reproduced with permission. …

  • Monthly Update April 2013

    April 21 Yet more progress on the upper level--ties are down!

  • Monthly Update March 2013

    March 21 More progress on the upper level--tracks for the Cental Vermont loop branching off the helix.

  • Monthly Update February 2013

    February 13 The last Progress Report showed the start of conversion of the diamond crossings on Section 14 of the helix to use movable frogs. This shows the …

  • Monthly Update January 2013

    January 2 We have purchased a new power supply especially for under-layout lighting. With 8 Amps output capacity! (A single string of 8 LEDs draws 320mA.)

2012

  • Monthly Update December 2012

    December 1 Alex constructed a small building and installed it in F-Yard.

  • Monthly Update November 2012

    November 14 Alex and John P have installed the LED light bars (seen in previous reports) in Berkmannville.

  • Monthly Update October 2012

    October 3 Progress today was on Section 14 of the helix, again--see February and March of this year. With trains now able to climb the helix, it’s time to …

  • Monthly Update September 2012

    September 15 No progress reports, but much Progress! David Lambeth visited and helped out with Activities Midway. He put new member Alex to work planting …

  • Monthly Update August 2012

    August 8 John M continues to work on a new crossing signal for the Activities Midway. He’s making it about 50% of the size of the old one, so here …

  • Monthly Update July 2012

    July 18 A few recently purchased items. The DeWalt drill is back in action, after suffering the simultaneous meltdown of the battery and charger. And now we …

  • Monthly Update June 2012

    June 13 Trimming plywood for the next section of Level 2.

  • Monthly Update May 2012

    May 9 This shows Progress occurring across WIndsor St, in the former parking lot (much missed by car owners).

  • Monthly Update April 2012

    April 4 The next phase of Level 2 construction required the production of sawdust, which took place out in the hallway in order to make cleanup easier. This is …

  • Monthly Update March 2012

    March 3 Very little happened tonight. Here is Eliza’s TV truck with a functional electronic package. You can see it in action at our Youtube page

  • Monthly Update February 2012

    February 1 We start with some pictures for our far-flung members, to show certain features of benchwork as an aid to layout design. Here’s a hole.

  • Monthly Update January 2012

    January 4 This shows the proposed new benchwork construction method for the upper levels. It combines slotted angle with UnistrutTM channel. Apart from the use …

2011

  • Monthly Update December 2011

    December 3 Oh my, such Progress! For the first time in many years--a new section of helix was made and installed. No track yet. Note the ultra-long nut-runner. …

  • Monthly Update November 2011

    November 5 This is the “minimally invasive” design with the two routes kept to minimum width, and as far back as possible.

  • Monthly Update October 2011

    October 1 Eliza is adding a blinking red roof beacon to her TV broadcast truck. With actual electronics!

  • Monthly Update September 2011

    September 7 Under construction-- a timber grade crossing at the chemical factory. Not paved like the one shown earlier because it’s too difficult through …

  • Monthly Update June 2011

    June 15 One of the switch machines at the chemical factory is operated by a hobby servo. There’s a video of it available at this address. The turnout is …

  • Monthly Update May 2011

    May 14 Switch machines have now been installed at the chemical factory (they are mostly in better focus). .

  • Monthly Update April 2011

    April 1 Here is the exhibit at the Compton Gallery, featuring our train. The MIT Museum staff added some mid-1960s pictures to the background--that’s …

  • Monthly Update March 2011

    March 2 Eliza and Mike worked on a new communication project.

  • Monthly Update February 2011

    February 5No pictures unfortunately, but the evening opened with visits by veteran members Pete Samson and George Mitchell. Governor Stunes shows new member …

  • Monthly Update January 2011

    January 26 Virtual progress! We’re planning the upper levels of the layout with the help of Google Sketchup. Here’s the triple-track ramp that rises …

2010

  • Monthly Update December 2010

    December 11 Something new from the Operation Committee. We’ve made up special slips which can be inserted in car-order pockets, to tell operators to hold …

  • Monthly Update November 2010

    November 3 In preparation for Saturday’s Operating Session, trains and car cards have been arranged.

  • Monthly Update October 2010

    October 27 Trackwork in the chemical plant area now includes complete turnouts.

  • Monthly Update September 2010

    September 8 Following a summer of torpor, TMRC has once again become the hive of activity that’s its usual state. Here’s Progress on the trackwork …

  • Monthly Update July 2010

    July 7 Alex has decided that maybe a hobby servo would be better for his project than a stepper.

  • Monthly Update June 2010

    June 5 Ties are down in the chemical plant area, and John P is attempting to making them look weathered and neglected, by painting them gray before staining …

  • Monthly Update May 2010

    May 3 The Operating Session took place as planned, and we generally agreed that it was a success. Here are Bill and Alex dealing with paperwork.

  • Monthly Update April 2010

    April 3 We saw some nice-looking industrial buildings at the South Shore Model RR Club a couple of weeks ago, which turned out to be the “Radical …

  • Monthly Update March 2010

    March 3 Today we arrived to find a note saying “Machine broken” on the Coke(R) machine. The trouble proved to be a broken coin chute, which had …

  • Monthly Update February 2010

    February 20 Eat your veggies. Thanks to Alex and his friends for importing the vegetables from Germany. Somehow they got past the fruit-sniffing dog at the …

  • Monthly Update January 2010

    January 2TMRC now owns a steam locomotive, our first in who knows how long (except BITCo #1/2, which seems to have wandered away). It’s the Bachmann …

2009

  • Monthly Update December 2009

    December 9 A simple attempt to use the Club’s venerable Pink Elephant to clean up some loose scenic material led to a teardown of the said Elephant, and …

  • Monthly Update November 2009

    November 25We had an excellent Open House on the 21st, and maybe someone will post pictures from it. And there’s Progress! New member Alex Keck worked on …

  • Monthly Update September 2009

    September 23 In order to prevent the points of this turnout from occurring on a bridge, a gantlet section was installed. This is based on a prototype in Bellows …

  • Monthly Update July 2009

    July 15 Michael’s latest in freight car assembly. This time it’s an Intermountain cylindrical covered hopper kit. The “Chesapeake” is …

  • Monthly Update June 2009

    June 13 First progress report for almost two months! It’s shocking. Michael Stunes has been assembling a couple of Red Caboose brand freight cars. He says …

  • Monthly Update April 2009

    April 1 John M worked on the steel warehouse in East Berkmannville.

  • Monthly Update March 2009

    March 7 A new doohickey for a Tortoise(TM) switch machine! To replace one that, um, unfortunately became lost.

  • Monthly Update February 2009

    February 4 Alas, on Saturday we said goodbye to David Lambeth, who is off to California. He said, “This isn’t the first time I’ve left MIT, …

  • Monthly Update January 2009

    January 10We were supposed to have an operating session and a club meeting tonight, but we were so busy with other projects we did neither. Our visitors from …

2008

  • Monthly Update December 2008

    December 06Running some trains on the nice, clean, post-open house track.

  • Monthly Update November 2008

    November 15 Tonight was clean-up night at TMRC in preparation for next Saturday’s open house. The club room is cleaner than it’s ever been, we …

  • Monthly Update October 2008

    October 4 We agreed to open the club to a group of alumni attending a party at the Museum. The party was held to commemorate the 50th anniversary of the Smoot …

  • Monthly Update September 2008

    September 17 David Lambeth has renovated the old “High Rise” section of Digital Widgets, with white LEDs undreamt of when Rodger Doxsey first made …

  • Monthly Update June 2008

    June 21 How did we manage to make so much Progress on the shortest night of the year? David Lambeth assembled a vast number of new storage cassettes for spare …

  • Monthly Update April 2008

    April 5 Testing locos in preparation for the Open House on the 26th. April 19 Plenty of progress but a paucity of pictures to prove it. For most of the night …

  • Monthly Update March 2008

    March 6 David L made a mockup of the proposed helix between the 2nd and 3rd levels. It dominates the scene at Middle Heights. James and Hugh dropped in. We …

  • Monthly Update February 2008

    February 16The theme for this week is PROGRESS. There was much Progress in East Berkmannville, pressed ahead by Adam, Quentin and David L. “Gentlemen, …

  • Monthly Update January 2008

    January 5 Progress for tonight was WEEDS. A lovely new patch of WEEDS has appeared between the main line and the bulk transfer siding across from F-Yard. Also, …

2007

  • Monthly Update December 2007

    December 15 [[pictures]](/old/progress/reports/2007/12/../../../imagese221.tcl?year=2007&month=12&day=15) Although we haven’t posted progress …

  • Monthly Update November 2007

    November 03The first of the new cab drivers (i.e. the boards which interface the walkaround cabs to the communication bus) is complete and installed. It …

  • Monthly Update October 2007

    October 07Adam spent much of the evening building better black holes. The picture shows (from left) Adam admiring his handiwork, Hugh queietly surveying tthe …

  • Monthly Update September 2007

    September 9We planned an operating session, tested cab interface boards, tried unsuccessfully to find a partially completed building, had two separate groups of …

  • Monthly Update August 2007

    August 18 Not much to report, but there isn’t much occurring on these hot summer days. The tracklaying crew has extended the siding in Middle Heights to …

  • Monthly Update July 2007

    July 11John Purbrick has built a mechanical kludge which he humbly states is “rather complicated” even by his standards. He installed it in the …

  • Monthly Update June 2007

    June 3Our humble web pages has been selected as the Webmasters’s Choice for June 2007 by the National Model Railroad Association. Welcome to everyone who …

  • Monthly Update May 2007

    May 12John McNamara and David Backus purchased a heroic amount of soda for the machine, which is now filled again. Adam worked on pouring water into the river …

  • Monthly Update April 2007

    April 7 [[pictures]](/old/progress/reports/2007/4/../../../imagesa4d9.tcl?year=2007&month=4&day=7) The big news for the evening is the great progress …

  • Monthly Update March 2007

    March 10 Tom finished installing the last of the plastic fence that surrounds the layout. These removable panels serve to keep trains on the layout in the event …

  • Monthly Update February 2007

    February 3 We had a very successful and well attended operating session tonight. According to Adam, who organized the event, 97 moves were completed, with only …

2006

  • Monthly Update December 2006

    December 2David Backus worked on a new and improved test track, with integrated power supply and meters for both volts and amps. This will be of use when …

  • Monthly Update November 2006

    November 4 [[pictures]](/old/progress/reports/2006/11/../../../imagesc2a1.tcl?year=2006&month=11&day=4) This morning and afternoon 12 TMRC members went …

  • Monthly Update October 2006

    October 14John Purbrick installed a pair of trees near a siding he has been working on for quite a while. With the installation of these trees, salvaged from …

  • Monthly Update September 2006

    September 1TMRC participated in the Activities Midway today. This is a chance to recruit new student members, something that is always important. Davids Lambeth …

  • Monthly Update August 2006

    August 2Anthony Rizos stopped by to discuss plans for promoting the club to incoming students. Tom and John McNamara went on a soda buying trip as we were sold …

  • Monthly Update July 2006

    July 26The system was bad tonight. Specifically, when power was turned on, all the block cards set all their blocks to full power, resulting in some degree of …

  • Monthly Update June 2006

    June 10The club hosted numerous visitors today. Some were here for alumni weekend (classes of ‘61, ‘66, ‘76 were spotted in the room), some …

  • Monthly Update May 2006

    May 6The open house was held, and things went pretty well, with just a couple of exceptions. A circuit breaker tripped twice causing a loss of 12 V power to …

  • Monthly Update April 2006

    April 8Tom and JP tried to determine the cause of and solution to a curious problem with the IMP. Under certain circumstances (which seem to be repeatable) the …

  • Monthly Update March 2006

    March 1 Andy showed up and painted some cars, including some N-scale equipment. John Shriver had some pizza, relocated one trolley pole in front of the …

  • Monthly Update February 2006

    February 1 There’s a new signal in Middle Heights. The background to this picture would have been clubroom clutter, but one of the members just bought …

  • Monthly Update January 2006

    January 7John Purbrick has installed some white LEDs in the building he has been working on in Middle Heights. The LEDs are unfortunately quite a bit bluer than …

2005

  • Monthly Update December 2005

    December 9TMRC was honored to be host to a delegation from the Rochester Institute of Technology Model Railroad Club, who were visiting Boston to photograph …

  • Monthly Update November 2005

    November 05 The system has a persistently intermittent failure mode, which has popped up every month or so over the last year, in which some of the cards on the …

  • Monthly Update October 2005

    October 15 A new verison of the System 3 user interface, SCab, has been installed on the computers in the club room. SCab 2 has been enhanced with improved …

  • Monthly Update September 2005

    September 2 On September 2nd, TMRC joined other campus activities at the annual Activities Midway. We brought our full-size crossing flasher (complete with …

  • Monthly Update August 2005

    August 30 Trackwork in the freight yard continues. Switches 176 and 167B, plus a diamond crossing, make up this outside single slip. It’s an uncommon …

  • Monthly Update July 2005

    July 30 We have an operating switchstand, designed around a helical cam operated from a Tortoise switch machine. Go to the Videos page to see an animated …

  • Monthly Update June 2005

    June 30 [[pictures]](/old/progress/reports/2005/6/../../../imagesd44a.tcl?year=2005&month=6&day=30)The management would like to remind everyone, …

  • Monthly Update April 2005

    April 30 Tomasz Mloduchowski has been rewriting the turntable controller to work with System3. In this photo he and James Knight are consulting on the task at …

  • Monthly Update March 2005

    March 31 We are making good progress constructing a Diesel service facility between the freight yard tracks and the old roundhouse.

  • Monthly Update February 2005

    February 28 This touch screen controls the west end of the new freight yard. It operates on an N-X (eNtrance-eXit) principle wherein the operator presses the …

  • Monthly Update January 2005

    January 31 In these photos, Adam Madlinger’s model of the Acela crosses the stone arch bridge that David Lambeth built in December. John McNamara and …

2004

  • Monthly Update December 2004

    December 31 At long last, a freight operating session was held. Planned by Malcolm Laughlin and set up by David Lambeth, the operating session ran remarkably …

  • Monthly Update November 2004

    November 30 The weekend before Thanksgiving, we held our annual Fall Open House. We did very well with visitors in the afternoon, but the evennig was a little …

  • Monthly Update October 2004

    October 31 Do we have a new freight yard? We have a new freight yard, just in time for the fall Open House on November 20th, with 6 tracks out of 7 operational, …

  • Monthly Update September 2004

    September 30 Hugh Robinson is working on a scheme to calculate the location of a train within a block based on integration of the velocity feedback information …

  • Monthly Update August 2004

    August 31 More signals by John Purbrick. Dissatisfied with the first scratchbuilt model (see April), he bought some photo-etched ladders and platforms and made …

  • Monthly Update July 2004

    July 31 We now have what we think is a pretty nice control and display system, with software by James Knight and Tom O’Reilly. Occupied blocks show up as …

  • Monthly Update June 2004

    June 30 The Gifford City station scene and the 105th Street industrial area are now completely separate scenes, thanks to the view block buildings constructed …

  • Monthly Update May 2004

    May 31 At the beginning of this month, we held our Annual Spring Open House. The room was packed with visitors from opening to closing! System3 functioned well …

  • Monthly Update April 2004

    April 30 Although our control system was designed from the beginning to drive signals, we haven’t been diligent about building and installing them. John …

  • Monthly Update March 2004

    March 31 Throughout this year, work has been proceeding apace on the freight yard. The design includes a team track, or in modern terms “transloading …

  • Monthly Update February 2004

    February 29 In this photo, David Lambeth and Genya Zaytman are adding scenic touches to “city hall hill.” David is adding a coat of the thinned …

  • Monthly Update January 2004

    January 31 Using foam core and wood putty, David Lambeth built a hill to give the city hall a more commanding position over the streets of Gifford City. The …

2003

  • Monthly Update November 2003

    November 3During the past few weeks, most of our attention has been focused on completing the main line section that bypasses the freight yard. This hand-built …

  • Monthly Update October 2003

    October 11Here’s what’s going on at TMRC as of this past Wednesday night: John Purbrick is working on the analog clock that is built into the …

  • Monthly Update September 2003

    September 3The past few weeks were all about getting ready for the Activities Midway and the start of term. As reported below, on Aug 24th the loop was …

  • Monthly Update August 2003

    August 9More progress on the main line construction from Berkmanville to the Gifford City Freight Yard. John Purbrick laid some track and did some switch …

  • Monthly Update July 2003

    July 5Today I (James Knight) arrived late today so I’m not sure what happened before 10pm. When I got here, Malcolm Laughlin was working on attaching …

  • Monthly Update June 2003

    June 25Okay, so we haven’t had any progress reports in a long time…oops. Anyways…what’s been going on recently? Lesse, there’s a …

  • Monthly Update May 2003

    May 21In addition to Ken Terrell’s tests of a 28-car Talgo train, Genya Zaytman ran six trains simultaneously (see attached picture). Running six trains …

  • Monthly Update March 2003

    March 31****Old cabs, new features Well I finally got around to adding the rest of the necessary features to control Trains. The changes are generic for all …

  • Monthly Update February 2003

    February 9In recent weeks, John Purbrick created a computer-plotted version of Malcolm Laughlin’s pencil-drawn design for the new layout addition. …

  • Monthly Update January 2003

    January 4Scenario: 1. After dinner on Saturday, discussion of track elevations reveals that conduit from central post to tower will require track to be a …

2002

  • Monthly Update June 2002

    June 12While System3 performed well at the recent Alumni Open House, there are still enhancements to be made. James Knight and Tom O’Reilly worked on …

  • Monthly Update May 2002

    May 26 [[pictures]](/old/progress/reports/2002/5/../../../images1a5a.tcl?year=2002&month=5&day=26) For all the System 2 nostalgia buffs out there, Tom …

  • Monthly Update April 2002

    April 10John Shriver completed the paving on the 100th Street bridge, with the exception of sanding. John Purbrick worked on helix construction, with special …

  • Monthly Update March 2002

    March 6John Shriver began the construction of tracks that will branch off the downtown Gifford City trolley loop and proceed toward the viewer over the …

  • Monthly Update February 2002

    February 2System 3 Progress Report So, today, after everyone else had left, I ran four trains around in a loop, all at the same time. How did I manage? Jeff was …

  • Monthly Update January 2002

    January 9Work continued in the Berkmannville area, as Roger Neumann worked on the layout skirting and John Purbrick worked on extending the scenic backdrop. A …

2001

  • Monthly Update December 2001

    December 12Ed Drozd tested three new Club locomotives. These are KATO units and run very, very well. The only complaint is that their headlights (white LEDs) …

  • Monthly Update November 2001

    November 7 [[pictures]](/old/progress/reports/2001/11/../../../imagesbd1e.tcl?year=2001&month=11&day=7)Much of this evening’s activity was …

  • Monthly Update October 2001

    October 3Malcolm Laughlin has completed the installation of the plywood for the East end of Berkmannville; John Purbrick and Bill cut out the piece last …

  • Monthly Update September 2001

    September 5Andy Miller worked on the retaining wall behind the Bassex House hotel in preparation for paving the alley. John Shriver finished the guardrails in …

  • Monthly Update August 2001

    August 1Andy Miller worked on building foundations in the Gifford City area. This was done in preparation for the installation of sidewalks and subsequent …

  • Monthly Update July 2001

    July 11A quiet night. Mal Laughlin continued his work on the TMRC freight cars, examining and inventorying them. He has created a long string of bad-order cars …

  • Monthly Update June 2001

    June 2Alvar and Jeff wired all the S-Yard blocks to the “Layout Feeder Panel #5” (LF5), located in the BK helix area. There are a total of 13 blocks …

  • Monthly Update May 2001

    May 2Tonight was a quiet night. John Purbrick ran a train around to test the system. Ed Drozd worked on a CO2 tank for CocaBubblie, Alvar Saenz-Otero paid a …

  • Monthly Update April 2001

    April 4Most of tonight’s activities were System3-related. Alvar Saenz-Otero arrived with some electronic goodies from DigiKey that included parts for …

  • Monthly Update March 2001

    March 3James brought in a fancy tripod and took literally hundreds of pictures in order to come up with an incredible panorama of the whole room! You can see …

  • Monthly Update February 2001

    February 7Malcolm Laughlin installed roadbed under two more switches in Berkmanville. Stefano Curtarolo weathered the area around the signal tower, including …

  • Monthly Update January 2001

    January 3Ben FrantzDale visited from his undergraduate work at Harvey Mudd College in California, accompanied by his friend Molly. Suffering an attack of …

2000

  • Monthly Update December 2000

    December 2We had another great Open House! We were happy to welcome kids from 3 to over 80! Now we are off to study for finals, and then we’ll do lots of …

  • Monthly Update November 2000

    November 11Sorry for the lack of updates, we’ve been working on the layout until too late at night and I’ve been too tired to write the reports. …

  • Monthly Update October 2000

    October 4Starting next week we will change our standard work sessions from Tuesdays to Wednesdays to better fit our academic schedules. The times remain the …

  • Monthly Update September 2000

    September 5Andy Miller continued his work on the railings for the REA/Amtrak Package Express parking lot. He also painted some cars and ran some trains. On the …

  • Monthly Update August 2000

    August 1John Purbrick added yet more track to the staging yard. He and Jeff discussed electrical issues concerning the yard, and Jeff began work on hooking up …

  • Monthly Update July 2000

    July 11Ed Drozd worked on the foundation of the building next to Coca-Bubblie. I (JEM) believe this building was originally built by Ed Sproles and called …

  • Monthly Update June 2000

    June 6John McNamara has received a roundhouse stall kit that provides suffcient parts for finishing the roundhouse roof, complete with smoke stacks, which he …

  • Monthly Update May 2000

    May 6Phase II continued its expansion. The first walls of the turning loop of Staging went up with lots of work by Alvar, Ben, Ed, and Bill. This section is …

  • Monthly Update April 2000

    April 4John Purbrick continued his work on the warehouse siding, installing very fine scale L-shaped pieces of wood that will model flange-way guards when the …

  • Monthly Update March 2000

    March 7Ed Drozd has completed the doors for the truck loading docks on the Coca-Bubblie building and worked on the loading dock itself, which will be complete …

  • Monthly Update February 2000

    February 1Ed Drozd continued his work in the Coca-Bubblie area by building a stone retaining wall that will protect Bubblie workers’ cars from errant TNP …

  • Monthly Update January 2000

    January 4Ed Drozd worked on the Coca-Bubblie building. He moved one of the support posts to more closely align with its support pad and painted the supporting …

1999

  • Monthly Update December 1999

    December 7Now that the Coca-Bubblie building has stairs and an elevator shaft that permit workers to pass from floor to floor, Ed Drozd is adding floors and …

  • Monthly Update November 1999

    November 2Ed Drozd did more work on the parking area around the Coca-Bubblie plant and built a new base for the building. James Knight refilled the Coke …

  • Monthly Update October 1999

    October 2Today Dick began to extend the siding for the factory next to the river and for the carbarn. On that subject, between Dick, Bill, and Alvar, we agreed …

  • Monthly Update September 1999

    September 4Andy began the design of the vertical lift bridge that crosses the east side of the large river in Gifford City. Bill continued his work. Alvar got …

  • Monthly Update August 1999

    August 3John McNamara and Alan Kotok worked on a paper that describes TMRC’s historic “System 2” (the relay control system that currently …

  • Monthly Update July 1999

    July 3Andy painted several pieces of equipment. Bill did interior work on the vegetable oil facility at the east end of Gifford City. Alvar worked a lot on the …

  • Monthly Update June 1999

    June 12Alvar began to work on the new crossover switch out of the west end of P-yard. This new switch is a curved crossover which was previously deemed …

  • Monthly Update May 1999

    May 1****Open House Day! Today was the first New TMRC Open House , and we had approximately 70 visitors throughout the day. We had people of every age show up; …

  • Monthly Update April 1999

    April 3John Shriver layed down the lattice stock into the carbarn. In order to accomplish that he began by shimming the lattice stock with one WECO card at one …

  • Monthly Update March 1999

    March 10Andy installed a concrete abutment for the “WPA Bridge” and did alot more painting. John painted the loading platform for the produce …

  • Monthly Update February 1999

    February 3John McNamara did some painting experiments in preparation for painting the new sections of the roundhouse rear wall. He discovered that Floquil makes …

  • Monthly Update January 1999

    January 6Andy Miller continued work on a highway bridge that he is building near one end of P-yard. He added pavement (complete with double yellow line) and …

1998

  • Monthly Update December 1998

    December 2Andy Miller painted some more of the “50th Anniversary” cars that the Club intends to sell. They look really sharp! John McNamara …

  • Monthly Update November 1998

    November 4Jeff, James, and Alvar worked on wiring design and documentation for the control of switches. The layout switches are now fully documented, making the …

  • Monthly Update October 1998

    October 7“Tuesday Night Work Sessions” have become “Wednesday Night Work Sessions” in deference to the problem set scheduling of two of …

  • Monthly Update September 1998

    September 22Jeff installed a replacement version of the doorbell that historically rang when FOO was pushed. Four new “feather-touch” push buttons …

  • Monthly Update August 1998

    August 1Bill Onorato and John Shriver sketched ‘version 1.0’ of the trolley route from the East side of Gifford City (old city loop) to the Gifford …

  • Monthly Update July 1998

    July 4****Happy 4th of July to all! Due to the holiday, attendance was pretty low; only Jeff and Alvar showed up. Jeff continued to wire the ROM, and now …

  • Monthly Update June 1998

    June 2Jeff and John P worked on the installation of track feeders for each block. Alvar, Jeff, and James worked on the support structure for the tower desktop …

  • Monthly Update May 1998

    May 5Ishak and John M continued work on converting the P-yard switches to Tortoise machines. Andy Miller did some more work on the new P-yard platforms. Jeff …

  • Monthly Update April 1998

    April 4Work continued on Gifford city. The last of the platform extensions were build by Andy Miller, and the street layout is now under way. Meanwhile Jeff …

  • Monthly Update March 1998

    March 3As a result of much work last weekend by Alvar, Jeff Birkner, James Knight, Alan Kotok, Tim McNerney, John McNamara, John Purbrick and others, plus work …

  • Monthly Update February 1998

    February 3As trains leave P-yard heading for the lower loop around the tower (see last week’s photo), they will pass over a two track bridge over a river, …

  • Monthly Update January 1998

    January 13John Purbrick demonstrated the switch-throwing capabilities of his electronic control system (“System 3”) using a roll of 100 feet of …

1997

  • Monthly Update December 1997

    December 2Tim McNerney worked on track at the West end of P-yard while John Purbrick added more ballast and worked on track in the 105th street area a few feet …

  • Monthly Update November 1997

    November 4 This evening’s major project was discussion of a tower. For those not familiar with the layout as it stands, the following piece of ASCII-art …

  • Monthly Update October 1997

    October 7 More ties were cut, installed, sanded, stained, and ballasted. Rail installation on the new P-yard loop began. October 14 James Knight and John …

  • Monthly Update September 1997

    September 2Jeff and Jonathan completed the wiring of track feeders between The System and the new terminal board (which will provide the ability of The System …

  • Monthly Update August 1997

    August 12This is the first posting of the progress report! Using the construction standards developed by Alvar and Joe, and the resulting construction plan …